Saturday, November 16, 2013

Reno@YIshun - Reno updates

Aluminium frame for lourve window installed, waiting for the glass lourves to come in now. All the electrical works are being laid with loose wires dangling here and there.



Water heater installed in the common bathroom area, we are going to have a false ceiling here with access panel to hide the huge storage water tank.
We have taken out the original sinks from HDB because we are going to install TOTO sinks and hans grohe taps with integrated vanity top and bottom cabinets. The original sinks were the pedestal kind of sinks that has a stand which took up quite a lot of space if we were to cover it up with a bottom cabinet.
Left photo: the 2 sinks from the master and common bathroom, both taken out.
Right photo: Location of the sink leaving only the water pipes.


Electric works are almost 90% completed now and painting works are going to start this week, together with installation of the lights.
This weekend, the rain shower and shower mixer, taps and sinks will all be delivered to site for installation.
Carpentry works are off site fabricating now, most probably will be delivered next week.

Here's hubs eating a Ramly burger on site because it was a mad rush (long story short, hubs had to be in the office from 9am-12noon) to the reno place and so hubs didn't have time to eat anything and went to meet the contractor while myself and Jules went to makan first at the food centre downstairs. I was starving and feeding for 2 so I had to eat first. After lunch, I packed a burger for hubs as there was a pasar malam where the Yishun Reno was ongoing.

next, we are heading over to the Toa Payoh flat. The existing home owners have moved out already and hacking works are going to start next Monday.




No comments:

Post a Comment

LinkWithin

Related Posts Plugin for WordPress, Blogger...